Spunky99
New Member
Sanded the places where I repaired the cracks in the fairing pieces and put on 2 coats of paint. Finished tightening the nuts holding on the new oil cooler. Crimped on the new quick disconnects for the side fairing turn signals and installed the side panels and the bottom skirt.
Went for a 30 minute check ride to fill up on gas and see how she handles at low speed and freeway. Purrfect!
Went for a 30 minute check ride to fill up on gas and see how she handles at low speed and freeway. Purrfect!